Green Formwork Steel/Aluminium Formwork for Construction

Products

Green Formwork Steel/Aluminium Formwork for Construction

Green Formwork Steel/Aluminium Formwork for Construction

Overview Company Profile Product Description It has unbeatable advantages. SAFE -The independent table with 6 directions

Send your inquiry

DESCRIPTION

Basic Info
Model NO. MB1812-MB606
Specification 1.8x1.2M-0.6X0.6M
Trademark GF
Origin China
Production Capacity 10000m2/Per Month
Product Description

Company Profile

Green Formwork Steel/Aluminium Formwork for Construction

Product Description

It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system. EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame2)Prop with early stripping mechanism3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.

Detailed Photos

Green Formwork Steel/Aluminium Formwork for Construction

Green Formwork Steel/Aluminium Formwork for Construction

Packaging & Shipping

Green Formwork Steel/Aluminium Formwork for Construction

Exhibition

Green Formwork Steel/Aluminium Formwork for Construction

FAQ

If you want to get the price of this system,you can provide the structure drawing.

We can do design and price proposal to you.