Galvanized Steel Facade Scaffolding System for Construction Platform Use with ANSI Certificated
Overview Package size per unit product 4000.00cm * 4000.00cm * 7800.00cm Gross weight per unit product 46.000kg Galvaniz
Send your inquiryDESCRIPTION
Basic Info
Model NO. | FAD |
Material | Steel |
Type | Fixed |
Structural Style | Multi-Pole Scaffolding |
Framework | Combined Scaffolding |
Supporting Mode | Projecting Scaffolding |
Lapping Form | Full Scaffolding |
Erection Position | External Scaffolding |
Move Method | Attached Lifting Scaffolding |
Scaffolding Part Type | Scaffolding System |
Construction Properties | Installation Scaffold |
Materia | Q345 Steel |
Certificate | AS/NZS 1576.3:1995, En12811 |
Model Number | Fad |
Load Capacity | 6.6kn |
Advantage | High Efficiency and Economy |
Transport Package | Pallet |
Specification | 730mm width |
Trademark | YueYang |
Origin | Jiangsu, China |
HS Code | 7308400000 |
Packaging & Delivery
Package size per unit product 4000.00cm * 4000.00cm * 7800.00cm Gross weight per unit product 46.000kgProduct Description
Galvanized Steel Facade Scaffolding System for Construction Platform Use with ANSI Certificated
Product Description
1.High Grade Steel takes heavy loading capacity, get to 6.6kN.
2.Special design for facad using, easy installation, less labour force, economic cost.3.More items for more possibilities.4.Aluminium facade scaffolding system can be customized.Item Name | Genaral Specification |
Frame | 0.66m(H)x0.73m(w) |
1.00m(H)x0.73m(w) | |
1.50m(H)x0.73m(w) | |
2.00m(H)x0.73m(w) | |
Guardrail | 0.73m(L), 1.09m(L), 1.57m(L), |
2.07m(L), 2.57m(L), 3.07m(L) | |
Diagonal Brace | 2.07m(W)x2.00m(H) Field |
2.57m(W)x2.00m(H) Field | |
3.07m(W)x2.00m(H) Field | |
Scaffolding Deck | 0.61m(W)x1.57m(L) 0.61m(W)x2.07m(L) |
0.61m(W)x2.57m(L) | |
0.61m(W)x3.07m(L) | |
Toe Board | 0.15m(W)x0.73m(L) |
0.15m(W)x1.09m(L) | |
0.15m(W)x1.57m(L) | |
0.15m(W)x2.07m(L) | |
0.15m(W)x2.57m(L) | |
0.15m(W)x3.07m(L) | |
Base Plate | 0.6m(H), 0.8m(H) |
Detailed Photos
Assembly Frame, Steel and Aluminium For Option | Special Lock System for single guardrail |
Alu-Ply wood Deck with 610mm width for comfortable walking through | Diagonal Brace Assembly |
Packaging & Shipping
Company Profile
Company Introduction:
Established in 2004, Changzhou Yueyang Machinery is located in Changzhou City along the Taihu shore, covering an area of 12, 000 square meters.We are near to Shanghai City and Nanjing City, enjoying convenient transportation access. We specialize in providing high quality scaffold systems, formwork systems, guardrail system, ladders, barriers, trolley and cabinet etc. to foreign and domestic high-tech industries, such as civil construction, petrol-chemical plants and large shipbuilding projects.
Customers
Production process:
Related Products
Related Products
-
European Certified Ringlock Modular Scaffolding Systems H. D. G.
-
Easy Scaffolding Building Material Concrete Column Steel Aluminum Plastic Panel Tunnel System Slab Prop Cone Accessories Steel Frame Formwork for Construction
-
Q235 Steel Scaffolding Poles Adjustable Building Aluminum Formwork Steel Support Push Pull Prop Jack Post Steel Acro Acrow Prop
-
Easy Aluminium Yellow Color Euro America Market SGS Certificate Scaffolidng Prop