Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price
workshop: Shipment: Certificate:
Send your inquiryDESCRIPTION
Basic Info
Model NO. | MP |
Construction Period | 5 Days |
Load Capacity | 60kn |
After Sale Service | Available |
Transport Package | Standard |
Trademark | MACPEX |
Origin | China |
HS Code | 8480411000 |
Production Capacity | 50000 |
Product Description
Items | Aluminium formwork |
1. Material | Aluminium alloy 6061-T6 |
2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 3-5 days per storey. |
4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |
workshop:
Shipment:
Certificate:
Related Products
-
Zulin High Quality Mobile Cuplock Galvanized Scaffolding Falsework Kwikstage Layher Ringlock Scaffolding System for Steel Construction Building Material
-
2020 New Aluminium Scaffolding Telescopic Ladders, Folding Aluminum Ladders Scaffolding
-
Easy Scaffolding Building Material Concrete Column Steel Aluminum Plastic Panel Tunnel System Slab Prop Cone Accessories Steel Frame Formwork for Construction
-
Bueno 4-18m Vertical Electric Hydraulic Single Person Lift Aerial Mobile One Man Lift for Sale with CE Certificate