Lianggong Reusable Concrete H20 Timber Beam Floor Slab Table Scaffolding Formwork
Product Description Table formwork is a kind of formwork that used for floor pouring , used widely in high-rise building
Send your inquiryDESCRIPTION
Basic Info
Model NO. | Table Formwork |
After-sales Service | Remote Service |
Warranty | One Year |
Certification | ISO9000 |
Material | Timber Beam, Plywood & Steel Props |
Type | Table Formwork |
Color | Yellow, Blue or Customized |
Bearing Capacity | 5~15kn/Square Meter |
Auxiliary Equipment | Lifting Fork, Shifting Trolley |
Transportation | by Trolley or Crane |
Customized Size | Available |
Transport Package | Steel Pallet or Customized |
Specification | Customized |
Trademark | LIANGGONG |
Origin | Jiangsu |
HS Code | 8480600000 |
Production Capacity | 2000sqm/Per Month |
Product Description
Table formwork is a kind of formwork that used for floor pouring , used widely in high-rise building , multi-level factory building , underground structure etc. During the construction, after the pouring completion, table formwork sets can be lifted by lifting fork to an upper level and reused, without need to dismantle. Compared with the traditional formwork, it is featured by its simple structure, easy disassembly, and being reusable. It has eliminated the traditional way of slab support system, which consists of cuplocks, eel pipes and timber planks. The construction speeds up obviously, and manpower has been saved greatly
Products ShowCharacteristics
Standard unit of table formwork
Table formwork standard unit has two sizes:2.44 × 4.88m and 3.3 × 5m .The structure diagram is as follows:
Assembly diagram of standard table formworkFor untypical floor casting, the non-standard table formwork can be designed according to the need. The combination of non-standard and standard table formwork can meet the needs of various shapes of floor pouring.
Edge and middle filler
Table formwork guardrail
The guardrail can be set at the edge of floor as needed, shown in the figure:
Lifting fork
The lifting fork for table formwork is used for lifting of the table formwork unit, which allows the overall transportation of the large-area table formwork, greatly improving the work efficiency and saving time. There are currently two main types of lifting fork s as shown:
Lifting fork operation chart
Project application
Shifting Trolley
The shifting trolley is used for the overall transportation of the formwork in the horizontal direction.
Trolley application diagram
Packing & Delivery
Packing: |
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. |
2. Different packages are used for different products: ---Bundles:Timber beam, steel props, tie rod, etc. ---Pallet:Small parts will be put in bags and then on pallets. ---Wooden cases:It is available on customer's request. ---Bulk:Some irregular goods will be loaded in bulk in container. |
Delivery: |
1.Production: For full container, normally we need 20-30 days after receive customer's down payment. 2.Transportation: It depends on the destination charge port. 3.Negotiation is needed for special requirements. |
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company
Lianggong Formwork. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service. During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc. Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
FAQQ1:Are you trading company or manufacturer?
A:We are factory.Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.B:We sell our products to the contractors, building companies, material supplier or trading companies.C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.D:We provide remote or on-site instruction to the builders.Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Related Products